|
|
Products |
Clean room engineering |
|
|
Advan can provide the service to the client who wants to establish the new Pharma plant as per the latest GMP guidance. The independent expert will make the initial layout till the total clean room solution to our client. After approving the design, Advan can recommend the qualified? manufacturers of the clean room facilities to supply the products and skillful engineering team to complete the installation. |
|
SCOPE OF WORK |
|
Design & Engineering |
|
Project management and installation |
|
Acceptance and hand over |
|
|
Manufacturing and supply |
|
Qualification (IQ/OQ) and validation |
|
|
|
MISSION |
|
Build reliable and innovative cleanroom systems with long economic life. |
|
Provides adequate after sales services to guarantee continuous operations |
|
|
CLEANROOM TECHNOLGY |
Cleanroom technology has emerged to a solution for many industries, like: |
|
|
Pharmaceutical and biotechnology |
|
Microelectronic industry |
|
Bio-safety laboratories, like P3 and P4 |
|
|
Hospitals for operating theatre, ICU¡¯s, labs |
|
Food industry for contamination control area |
|
Chemical industry |
|
|
|
Cleanroom technology is a guarantee for a high quality cleanroom system in compliance with the applicable standards and regulations.
Each environment has its own technology and requirements. The products in each environment may be quite similar but application and product details differ per industry
.
Next to different technical solutions each environment has to comply with their own standards and regulations.
This specific knowledge and experience can be found in our company. Design, products and installation are all controlled in one hand and one responsibility. |
|
|
CLEANROOM CLASSIFICATIONS |
ISO 14644-1 |
US Fed. Stan. 209E |
Classification
|
1-2 |
- |
- |
3 |
1 |
- |
4 |
10 |
- |
5 |
100 |
A-B |
6 |
1000 |
- |
7 |
10000 |
C |
8 |
100000 |
D |
|
|
|
|
DESIGN & ENGINEERING |
|
Each cleanroom system is made specifically to the needs of client and process requirements. |
|
15 years experience in design and engineering of many different types of cleanrooms. |
|
All our companies follow the international design standards and keep up to date on developments in guidelines and regulations. |
|
All our cleanroom systems will be in compliance with the newest regulations. |
|
|
Design process |
Design deliverables |
Design deliverable
|
Conceptual |
Cleanroom |
HVAC |
Lay-outs |
P & ID |
Shop drawings |
AHU schematics |
Detail
|
|
Ducting drawings |
etail drawings |
Utilities lay-out |
Products |
|
Manuals/Specification |
Acceptance |
As built drawings |
As built drawings |
Product documentation |
Testing & commissioning |
|
Product documentation |
|
|
|
|
PROJECT MANAGEMENT |
|
Project planning |
|
Coordination with other contractors |
|
Clear responsibilities |
|
|
|
|
|
Project execution |
|
Own project supervisors |
|
Strict progress control |
|
|
|
|
Experienced installation teams |
|
|
|
|
Quality control |
|
International standards |
|
Report to management |
|
|
|
|
|
Safety management |
|
Safety policies and guidelines |
|
|
|
|
|
Testing & Commissioning |
|
HVAC qualification program |
|
Documentation / reporting |
|
|
|
|
|
Acceptance |
|
Acceptance protocol |
|
Final budget |
|
|
|
|
|
HVAC PRODUCTS |
1. Air Handling Units |
Based on design specifications the right AHUs are selected, supplied and installed. |
|
2. Airducts and dampers / connection to user rooms |
Airduct lay out will match to cleanroom ceiling and filter box. |
|
3. Insulation |
Modern insulation materials give high insulation factor and high flexibility in case of maintenance or adjustments. |
|
4. Filter boxes |
|
Lightweight |
|
Easy filter exchange |
|
|
|
|
CLEANROOM PRODUCTS |
Product principles |
|
Flush finishing and airtight |
|
Dismountable and flexible |
|
|
Combinations of wall systems |
|
|
|
Ceiling Systems |
|
Dismountable ( 1170¡Á2400 ) |
|
|
Tongue and groove ( 1115¡Á3000 ) |
|
|
|
Windows |
Double glass safety |
The double sided glazing is not interconnected. In case of glass break, the cleanroom is not exposed to other areas and the cleanroom parameters are kept in place. |
|
Wall / Door windows program |
|
Flush double glazed windows |
|
Different glass ( safety / fire rated ) |
|
Emergency windows |
|
|
Variable sizes |
|
Double glass with UV-filter built-in |
|
|
|
Other Products |
1. Pass through boxes |
|
Electronic interlock |
|
Ventilation |
|
|
|
2. Built in working benches |
3. Light fixtures |
|
Floor program |
|